Plants and Equipment Division

Paul-B Plants and Equipment Ltd was incorporated on 4 December 2007 as a private limited liability company. The authorization share capital of the company is 10,000,000.00 and was fully subscribed to at incorporation.

The objectives of the company include among other things to establish a quarry industry and carry on the business of stones and rock breaking, cutting and crushing in every description. It was equally created to achieve the following:

  • To prospect, exploit the solid minerals raw materials resources of our country for the quick development of its highways, shelter industry, agriculture and commerce and to deploy our gains for the development of the manpower resources and economic activities of the country.
  • To start exploits in the quarry sub-sector and gradually expand to the exploitation of other solid mineral resources.
  • To be reckoned as one of the best in the solid mineral resources development industry.
  • To develop high levels of technical and administrative manpower resources.
  • To make our staff, suppliers, customers and our host community happy.
  • To render the services of equipment hiring / lease for road construction / others.
PAUL-B QUARRIES

Under its Plants & Equipment Division, Paul-B currently operates two Quarries. One in Amuofia Esan Ngbo,Abakiliki, Ebonyi State and another at Uluoke, Auchi, Edo state. The company also recently established an asphalt plant in NENI, Anambra state to serve our current numerous and prospective customers in the roads & Engineering sector.

Management: The promoters of Paul-B Plants and Equipment Ltd are experienced people with wide contacts in the construction industry who with well-trained skill and motivated employees capable of converting the set objective into reality.

Material Being Processed: (20-25mm), (10-15mm), 3/8" (2-10mm) stone base (0-50mm), industrial dust (0-5mm). These essential aggregates in the construction industry are for concreting and bituminous mixes.

Capacity 750 tonnes per hour
Expected Annual Production 1,800,000 tonnes
Operation hour per week 48 hours
Beginning operational level 70%

Necessity drives quarry and Asphalt plant projects which are major aspect of the company’s repositioning programme to support our road and engineering division with equanimity depending less on outside suppliers for road stones.

PLANTS & EQUIPMENT: We have the following plants/equipment to enable us mobilize for any building/civil engineering project at a very short notice.

S/N NAME NUMBER
1 TOWER CRANES 10
2 MOBILE CRANES 6
3 BULLDOZERS (CAT D6/ D8) 5
4 PAYLOADERS (CAT 950) 10
5 WHEEL LOADER (CAT 966) 10
6 EXCAVATORS (CAT 225) 10
7 MOTOR GRADERS(14G) 6
8 MOTOR SCRAPPERS 3
9 BATCHING PLANTS 2
10 MOBILE MIXERS (5M3) 6
11 CONCRETE MIXERS (250-750 LIT) 15
12 CONCRETE VIBRATORS 15
13 COMPACTORS 6
14 PNEUMATIC ROLLERS (22 TONNES) 10
15 SMOOTH ROLLERS (10 TONNES) 3
16 HAND ROLLERS (3.5 TONNES) 4
17 CHIPPING SPREADER 1
18 ASPHALT FINISHER 4
19 TAR BOILER 2
20 BITUMEN HAND SPRAYER 5
21 TIPPER TRUCK (10-20 TONNES) 30
22 TRAILER 3
23 WATER TANKER 5
24 TRACTOR & SEMI TRAILER 3
25 HIAB LORRY 3
26 BLOCK MOULDING MACHINES 5
27 SURVEYING EQUIPMENT (SET) 10
28 WELDING EQUIPMENT (SET) 10
29 GENERATING SETS (35 300KVA) 10
30 LIGHT VEHICLES 40
31 COMPRESSORS 25
32 POTA CABINS 20
33 STORAGE CONTAINERS (20-40)FT 20
34 QUARRY EQUIPMENT 40